Category: Train Orders

  • TRAIN ORDERS – XTRA June 2019

    CALDER NORTHERN GROUP

                                              X-tra TRAIN ORDERS June 2019

     

     

     

     

    Start-up instructions when operating North Western Mills layout.

     

     

     

    Hi there,

     

    Alan Wyatt has kindly set out a start-up procedure when switching on the North Western Mills HO scale layout in the clubroom. These instructions are for members to follow in sequence to ensure the layout powers up correctly and in the right order.

    When you are scheduled to operate at weekends according to the rota then these instructions should be followed to make sure no hiccups occur and you can have a trouble-free session.

     

    A copy of these instructions will also be placed on the clubroom notice board.

     

     

    Terry Wynne

    Secretary

     

     

     

     

    CREWE DIGITRAX START-UP & SHUT DOWN

    START UP

    Number ITEM Check
    1 Check position of switches on the DCS210 Command Station, the mode switch should be set to RUN, and the scale switch should be set to HO.

     

     
    2 Check position of switches on the DB210 Booster, the mode switch should be set to RUN, the scale switch should be set to HO, the AUTO REV switch should be set to OFF and the AMPS switch should be set to 5.

     

     
    3 Turn the power for the layout on at the wall. Switch on the Digitrax equipment by switching on the things plugged into the 6 way extension one at a time.

     

    Start with switch 1 the Loconet power supply, switch it on.  The UR92 on top of the pole should show a steady red light and a blinking green light.

     

    Using switch 2 switch on the Booster, the lights on the DB210 should show-

    • PWR – red light that flashes about every 3-4 secs
    • TRACK STATUS – steady white light
    • NET – steady red light that will flash when instructions are sent across Loconet.

     

    Using switch 3 switch on the Command Station, the lights on the DCS210 should show-

    • PWR – green light that flashes about every 3-4 secs
    • TRACK STATUS – steady white light
    • NET – steady red light that will flash when instructions are sent across Loconet.  IMPORTANT – If this light is not on and the command station looks like the lower photo then the voltage on the Loconet is low and engines may behave erratically.  If the light is not on then switch off sockets 1 to 3 on the extension lead, pause and then switch on again..

     

    The red light should have gone out on the UR92 to be replaced by a blinking green light showing that the wireless transmitter is talking to the control station.

     

    The circuit breakers should all show a steady red light on each breaker.  If they don’t and the track indicator lights are off on the Command Station and the Booster then find a DT500 controller, put a charged battery into it and then plug it into the layout.  Press the PWR switch to turn on the controller and see the following screen display.

     

    Press the Y/+ key for a couple of seconds.  The lights on the breakers and the track status lights on the Command Station and the Booster should illuminate to show that the track power is on.

     

    Switch 4 controls the power to the points system.

     

    Switch 5 is for the battery charger.

     

    Switch 6 is for Mikes’ layout  For normal operation check,–

     

    See also the pictures below,

     

     
    4 Select the controllers you want to use and using a batteries from the fully charged section of the battery tub fit batteries into the controllers.

     

    Then, if it is a wireless throttle, plug it into the layout to enable it to join the duplex group ready for wireless operation.  After about 10 seconds unplug it from the layout.

     
    5 At this point if the breakers are all showing a red light there should be power to the tracks, so put a loco on the layout, select it and see if it responds to the controller.  If it doesn’t plug the controller into the layout, reselect the loco and see if it responds to the controller.  If it now responds unplug the controller and check that the train can now be controlled wirelessly.

     

     
    6 If a UT4D controller does not appear to be working properly then plug it into the layout, if it now works correctly then unplug it and change the battery for a fully charged one.

     

     
    7 A DT500D must have a 9-volt battery installed for tetherless oper­ations. When you install the battery press and hold the PWR key to turn your throttle on, the throttle will report the battery voltage then display the last screen displayed before the throttle was powered off.  If the voltage shown is less than 6.5Volts then the battery must be changed or the controller plugged into the layout.  NB this will not charge a flat battery.

     

     

     

     

    CHARGING BATTERIES

    Number ITEM Check
    1 Plug a battery into any of the 10 bays in the charger unit.  A red light alongside the battery slot shows that the battery is charging.  When the red light turns green then the battery is fully charged and can be removed and placed in the tub for charged batteries.

     

    Charging batteries will take up to 4 hours for a totally flat battery.

     

     

     

    SHUT DOWN

    Number ITEM Check
    1 At the end of a session despatch any locos from the controllers to avoid problems on start up at the next session, see controller manual for how to do this.  Turn off the power to the layout by turning off the switches on the extension lead and then turn of power at the wall.

     

     
    2 Remove the batteries from the controllers, they should then be put in the “used” part of the battery container and every Wednesday used batteries should be charged and put into the charged section of the battery box.  This should ensure sufficient charged batteries to begin a weekend running session.

     

     

     

     

     

     

    CREWE DIGITRAX START V4

     

  • TRAIN ORDERS – August 2019

    CALDER NORTHERN GROUP

                                              TRAIN ORDERS August 2019

                                                                                      

     

    Hi everyone,

     

    Can you please note that our September Meet and the October Meet are each being put back 1 week? This means September Meet will be on Saturday 21st and the October Meet on Sunday 13th.

    This is to avoid conflict with the “Wheels of War” weekend on 14/15th September and another event the following month.

    Paul, can you liaise with members please to adjust the rota to cope with this late change of date? It may only mean swapping weekends around for this listed to operate.

     

    Now to usual TO matters!

    Sorry for the lack of Train Orders recently but domestic matters have taken up my time.

    Work on the Digitrax system has continued since the last TO concerning the circuit breakers. Alan Wyatt has written up a set of instructions to be used at start-up of North Western Mills layout which you should all familiarise yourself with this document. A copy of these instructions has been circulated initially to those involved in the rota operation at weekends and a copy will be placed inside the ‘Yellow Key’ Coffin under the layout, where the throttles and batteries are kept.

    Those operating over the past few weekends have reported that the layout worked without problem and they emphasised that the start-up procedure was followed directly.

    Each Wednesday recently time has been taken to ensure the tracks were cleaned and wheels on locos dealt with. Thanks to all those involved in this labour-intensive activity. It is intended to deal with all rolling stock in the same way as you know we have a clubroom and layouts that are subject to a dusty environment due to type of building it is and the close proximity to the tracks outside. Improved operation has been noted by all as a result of this attention.

     

    I regret I have been lax in informing everyone about those who have been ill or experiencing other complaints. For this I sincerely apologise. Firstly, I am sure we all send Dave Ford our best wishes for his forthcoming operation on October 2nd to deal with his gallstone problems; hence we have not seen Dave or Len at the clubroom recently, plus they have moved home which is further from Crewe than before. Dave Theobold has also been ill and whilst Dave came along to our group meet on 9th June, he is still making slow progress. His illness is still being investigated and we wish him well for a full recovery. Mike Turner has been ill and Mike had to go into hospital for a short stay but thankfully is now able to join us again at meetings. John Massey has also been ill and we hope to see John again as soon as he well enough.

     

    We should also think of Stuart Wood who had moved to live in Beechmere assisted care home. As you probably saw on TV this building in Crewe suffered a major fire incident which resulted in a partial collapse of the building. We have not heard what has happened to Stuart but know that all the residents were evacuated safely but many have lost all their belongings. A very sad situation for them all and hopefully we will get a message from Stuart or maybe be find someone who can put us in touch for the latest news.

     

    You will have no doubt seen mailings from Paul Mitchell recently asking for some additional help for the weekend operation of the layout whilst the Heritage Centre is open to the public. We are as a Group getting fewer in number and this unfortunately means those prepared to operate at weekends will hopefully come forward additionally to help Paul out to cover each day. This really means that each of us will need to operate a greater number of times during the year compared to last year. This issue has raised itself whilst Len & Dave are not available and also because we have a number of members who have some health issues and unable to get to Crewe as often as they would wish. You will also appreciate when Mike Lenz is shown on the rota he is actually working in his capacity as Heritage Centre Manager and therefore not able to operate the layout. He can on these days be seen working in the pay-hut or in the café.

     

    You will also know that an issue has arisen where cars are no longer allowed to proceed beyond the level crossing gates at weekends. This means you have to park your car in the car park and walk to the NJSB. However, if you can arrive at the Centre before 09.45am then you can drive down to the NJSB to deposit models that you may wish to run but you will then have to drive your car back to the car park before 10am. We know this is rather inconvenient particularly in inclement weather so do ensure you have suitable clothing or umbrella in your car. This parking issue is being discussed by Tony Gath and the Trust in respect of those who are blue-badge holders and/or unable to walk longer distances. You will be advised of the outcome the discussions as soon as we are informed. In addition we understand but not formally notified that the Centre may be open through October this year. We will need this to be raised with the Trust.

     

    Tony Gath and Alan Wyatt have been busy and we now have a work-table with spot light  at the far end of the central walkway of the layout. This is for member use to deal with any small work instead of using the table in the window overlooking the tracks. Thanks very much guys.

     

    Terry Wynne

    Secretary.

  • TRAIN ORDERS – XTRA September 2019

    CALDER NORTHERN GROUP

                                                XtraTRAIN ORDERS September 2019                           

     

     

    CALDER NORTHER FREIGHT CAR DECALS                                                  

     

    Hi everyone,

     

    Further to the information given in the last Train Orders concerning Calder Northern decals we are now in a position to give much more details for these items.

     

    Alf Milliken has kindly produced decal sheets showing the Calder Northern wording and logo for affixing to freight cars. These will be available in two sizes These decals are being produced with the kind permission of Steve Park who held the IPR for the decals. The permission given by Steve and the efforts of Alf in making these available to members is much appreciated. Thank you, gentlemen!

    Alf brought along the early samples of the decals to show members at our Group Meet on Saturday just gone and these decals included those showing the Calder Northern name and car numbers which can be printed in white or black or even in a range of other colours should they be required. The sheet containing the double rose logo will be available as a separate sheet.

     

    Alf has provided a pricing structure for these items and all orders should be sent to him by email or accepted in person in the Clubroom. Email contact details are in the Directory.

     

    Pricing is as follows: –

    • Normal black printed decals – HO or N scale – £3 per sheet (A4 size sheet with enough decals for both sides of 5 vehicles)
    • White printed decals or any special decals printed on white decal paper (double rose logo etc) – HO or N scale – £5 per A4 sheet as above.

     

    Please note that if you request postage of your order, decals will not be sent folded and therefore a fixed price postal rate based on Royal Mail ‘Large letter rate’ of £2 first class or £1.80 second class will be charged for orders up to a dozen sheets.

    Decals delivered for collection at Crewe Heritage Centre will be delivered free of charge.

     

    Currently available are:

    • Data/Build Year data sheets (essentially blocks of numbers from 0-12 representing inches/months and 0-99 representing feet/years) in either Railroad Roman or Railroad Gothic, these being the two most common fonts for this.
    • Random car numbers in the 1000-100000 range.
    • Calder Northern wording and CNOR reporting number decals.
    • Locomotive warning marks such as “fire extinguisher”, “600 Volts” etc.
    • County flags of the 4 counties that make up the Calder Northern Group – Cheshire, Cumberland, Lancashire and Westmorland (no wording on these just the logo).

     

    If anyone wants a specific car number or simple text/logo I will do that FOC as I have a couple of part-used decal sheets that can be used. Anyone with specific artwork is welcome to supply me with a copy and I will try to replicate it, although there may be an additional cost involved.

    Details given above have been provided by Alf. He also says he can provide decals in ‘O’ scale if required but prices will be quoted for any requirements.

     

    If anyone has any questions or suggestions concerning the decals then please communicate directly with Alf Milliken but include c.c. to me so that your committee are also aware of your thoughts and suggestions. Thank you.

     

  • TRAIN ORDERS – September 2019

    CALDER NORTHERN GROUP

                                              TRAIN ORDERS September 2019

                                                                                      

     

    Hi everyone,

     

    Just a quick reminder – please note that our September Meet and the October Meet are each being put back 1 week? This means September Meet will be on Saturday 21st and the October Meet on Sunday 13th.

    This is to avoid conflict with the “Wheels of War” weekend on 14/15th September and another event the following month. It may only mean swapping weekends around for those listed to operate.

    Paul, is also advising a revised rota (below) which he has agreed with those who have kindly volunteered to cope during the month of October. The Heritage Centre will be open to the public in October which is an extension to their normal open season.

     

    Now to usual TO matters!

     

    In the last Train Orders, I advised that Stuart Wood had been one of those persons displaced after the Beechmere assisted care home in Crewe suffered a major fire incident rendering the building unfit for occupation. I happened to see Stuart last Thursday in Sainsbury’s, Nantwich with his care person, Stuart leaning heavily on the trolley to avoid falling. Stuart did not look at all well and he told me he had lost all his belongings; his clothes, special treasured belongings plus his electric invalid scooter. His carer explained however, he had that very morning been reunited with his model of HMS Victory (or was it Victorious) that he had been making. It has been recorded that many local residents of the area who went into the building whilst it was on fire grabbed as many things as they could knowing that memories were probably more important to those 150 occupants than clothes and the like. I wished Stuart well from all of us, which he appreciated.

     

    You will have no doubt seen the mailings from Paul Mitchell recently asking for some additional help for the weekend operation of the layout whilst the Heritage Centre is open to the public during October. I do hope you can help where required. This matter has been sprung on us and your committee felt we had to try and cover each of the weekends as we did not want to have any issues that could work against the group. There are still a few places to fill so please do help where you can. Current position is as follows –

    Calder Northern cover September/October 2019

     

    Weekend Saturday Sunday Required
    7-8 Sept Alf Milliken Terry Wynne  
    14-15 Sept Bob Bevan Paul Mitchell Cover for Sat with Bob Bevan
    21-22 Sept Meeting Alan Wyatt/Mike Turner/

    Tony Gath

     
    28-29 Sept Steve Scott/Bob Bevan Roy Harris  
    5-6 Oct Alf Milliken/Mike Hawkes Tony Gath Cover for Sun with Tony Gath
    12-13 Oct Bob Bevan/Terry Wynne Meeting  
    19-20 Oct Paul Mitchell/Alf Milliken Alf Milliken/Tony Gath  
    26-27 Oct Steve Scott/Bob Bevan David Best/Elliot Lamb  

     

    Many years ago, Steve Park along with Les Herriot arranged for a set of Calder Northern freight car decals to be printed. These were produced in HO scale and N scale in both black and white so that they could be used on vehicles of differing background colour. The decals also included a logo depicting the red and white rose as the then Division membership located in both Lancashire and Yorkshire. Steve has recently agreed we can go ahead and produce these again for members at a small charge. Alf Milliken is able to produce these using his printer and can now produce the white lettering for us. We intend to do as last time by making these available for both scales and in two different sizes in each scale so they can be used on boxcars, tank cars and gondolas etc. Obviously, we will need to make arrangements for you to order your requirements and details will be sent out as soon as we have finalised the price per decal sheet and how we are going to impose the decals on the sheet of decal film.

     

    After a long gap in communication due to preparations for moving home, Tom Griffiths has asked me to pass on his best wishes to you all. Tom has had to spend much time downsizing and his home layout has had to go and a lot of his models are now with his model club. He says the move from a 5-bed home with attic and basement to an apartment is proving hard as we all know we tend to accumulate much more than we need (as Tom says, too much junk!). He therefore, will not be seeing us this year for either the Aberdeen or Warley events but hopes he may be able to get over to Crewe in the Spring.

     

    The British Region Convention is in Aberdeen this year and if anyone is attending then do let me know. Jonathan Small, Calder Northern member, will know if you take Roundhouse magazine, be our proposed new Vice Chairman and we wish him well in his new role. Jonathan reminds me that if anyone is to submit models for AP judging then please ensure all the documentation is completed in full. I am still uncertain about attending but could help with any information that may be needed.

     

    Finally, for this newsletter, Christmas is already in the shops and this reminds us that we need to think about donated prizes for our Group Christmas raffle. As you know this is one of our major fund-raising efforts for the Group and any donated prizes are much appreciated. Bob Bevan says he again welcomes a varied selection of prizes this year!

     

     

    Terry Wynne

    Secretary.

  • TRAIN ORDERS – Decal Photo

    Alf Milliken has kindly sent a copy of the Calder Northern Double Rose logo and the 4 Counties logo so everyone can see these items. Alf says sheets of these logos will be £5 per sheet with enough images to do a few freight cars. So guys, get cracking and maybe we will see a full train of cars, all with CN or 4 Counties logos and wording. Perhaps we might see the odd locomotive suitable lettered as well.

  • TRAIN ORDERS – November 2019

    CALDER NORTHERN GROUP
    TRAIN ORDERS November 2019

    Hi everyone,

    First of all, will you please note that as the Heritage Centre has closed its doors to the public for the winter you can now bring cars onto the site until the beginning of April.

    At our October meet a general discussion took place regarding work to be undertaken during the winter break whilst the Heritage Centre is closed to the public. Members were invited to comment on the following proposals.
    • To undertake work on the Heritage Centre Signal controlled layout in the middle room. For the track to be doubled with the outer track to have a continuously running freight train and for the inner track as now to be controlled from the signal levers. The track to be replaced where required and any electrical work to be carried out as appropriate. The curves at each end of the layout to be eased for better running and alignment. – approved.

    North Western Mills – HO scale DCC
    • Replace the NCE circuit breakers with the Digitrax ones and purchase a PSU and install the second booster, re-assigning the power districts in the process. – approved
    • Fit a flasher unit to the working lights on the short line grade crossing – agreed
    • Remove the diamond into Mornflake and replace with a point, replace the existing point with plain track. – in abeyance and for further discussion.
    • One of the control panels for the front of the layout has a false LED indication for the point setting, cross over the connections. – agreed
    • The panels for the front of the layout could do with the schematics refreshing to better show the track layout. – agreed
    • Re-lay the curve into the short line and change the point positioning so as to improve traffic flow through them and where we can do away with all the curved points and just use ordinary ones without loss of operational function. Include some small track adjustments to approach tracks to scrap metal industry and oil depot. – approved
    • Motorise the three points on the short line curve. – agreed
    • Replace the double slip in the station throat realigning tracks to include a loco holding track and adjustment to caboose road. – approved
    • Pelmet style layout lighting using LED strips. – members questioned need for this – deferred for now.
    • Finish off changes to low relief buildings against the backscenes. – agreed

    Devils Creek – HO scale DC
    • Set up the layout and operate it for a day to establish how it will be operated and what that means for the control wiring.
    Tidy up the finish of the return loop baseboard and paint it a suitable colour.
    Fit the train detection sensors to the return loop
    Fit switches to the point motors on the return loop to provide point setting indication.
    Make up a new control panel for the return loop and main layout.
    Remove superfluous wiring.
    Update all documentation and circuit diagrams when work is complete
    Replace broken point in station and make repairs to any other track faults. – this was all agreed and that when completed members should be given training on the operation.

    Baltic Street Yard – N scale
    • Fit backscenes and finalise building placement
    Fit point motors and wire the layout to baseboard edges and test run
    Build control panel and wire control panel. – all these items agreed.

    North Western Mills layout –
    Deleting loco addresses when operating the layout.

    A situation arose recently where members started operating a loco on the layout only to find another loco with a different address was moving as well. Alan Wyatt has put together the following words as a reminder to members to follow these instructions to avoid similar issues arising again. Can you please read these instructions and also if you have any problems controlling your locos on the layout also seek out information from the Digitrax manuals in the coffin under the layout, thanks.

    5.6 Releasing An Address From A Throttle
    When you are finished running a locomotive address, release it from your
    throttle so that it is available for other throttles to select and run.
    Infrared Throttles must be plugged in to LocoNet to release an address from
    your throttle. Duplex Radio Throttles do not need to be plugged in to release an
    address. You can disable this safety feature by setting your DT500’s Options to
    allow tetherless release (See Section 10.0 (IRRelease) for instructions).
    © 2016 Digitrax, Inc. www.digitrax.com
    1. Use the throttle to make the locomotive’s speed zero (this step is optional
    but strongly recommended as the loco will continue to move if speed is not
    reduced to zero).
    2. While the loco’s address and speed information is displayed, press the
    LOCO key to go into select mode. This will release the address from your
    throttle immediately.
    3. The address will begin to blink in the display. Press the DISP key to dispatch
    the address on the throttle and the address will be released to the system
    and marked as a dispatched address. See Dispatching below. Pressing
    the EXIT key releases the address from both the throttle and the locomotive
    stack in the system. The display on your DT500 will show SEL for the
    throttle.
    4. If you press the LOCO key again, the throttle will begin flashing the
    address you just released. You can re-select that address by pressing the
    LOCO key or you can use the throttle knobs or key pad to browse to a
    new address and select it instead.
    5.7 Dispatching addresses or consists
    Dispatching is a special feature incorporated in the LocoNet language to meet
    the needs of operators that wish to enforce a strict discipline in how operators
    gain access to locomotives during an operating session. Dispatching also lets
    you run consists with basic throttles that can’t set up their own consists and run
    four digit addresses on basic throttles that only have two digit capability. It lets
    you have newcomers run trains on the layout without giving them access to the
    entire operation.
    When you dispatch a locomotive address or consist to your LocoNet system,
    you make it available to be acquired by another throttle. Only one address at a
    time can be marked as a dispatched address in the system.
    To dispatch a locomotive address using a the DT500
    1.Press the LOCO key to enter address selection, browse to the address you
    want to dispatch.
    2.Press the DISP key to dispatch it to your LocoNet system, that’s all there is
    to it!
    The dispatched address can be a single locomotive address, either two digit or
    four digit, or a consist that was set up by the DT500.The TOP locomotive in
    a consist or MU can be dispatched to transfer control of the entire consist to
    another throttle.
    NOTE:DT500 throttles operating in IR mode must be plugged in to LocoNet
    to dispatch loco addresses.DT500D does not need to be plugged in to dispatch.

    Other news –
    I have had a recent telephone call with Derek Milby. Derek sends his best wishes to everyone and hopes soon to be able to make the trip down to Crewe. He is keeping reasonably well but is restricted to using the train for his getting about. I suggested to him that if he decides he wishes to come to a Group meeting then if he lets us know in reasonable time, we can have someone meet him at Crewe station and transport him to the meeting and of course return him to station afterwards. He feels that would be most suitable and hopes to do that as soon as possible.

    For a good while I have been trying to contact Len Ford to ascertain how Dave’s operation had gone only to be told when I finally managed to email Len that Dave was still waiting for his surgery. He had a pre-op early in October but is suffering badly with pain, has to be careful what he eats and cannot do anything. Dave just wants the operation and it is taking its toll on him. I have sent the good wishes of all of you and say that we hope his operation comes soon. Len has given me his new address and contact details but before I issue that to all I have asked his permission first and await his reply.

    John Massey has also been unwell but contact with John means that hopefully he will also be able to come along to meetings again.

    Alan Wyatt has advised that he will not be available during the next month or so as his wife is unwell and they are awaiting hospital reports. Our thoughts go out to you both, Alan and Gillian, we hope the medics can provide a solution and that Gillian is soon feeling better.

    Next meeting – Saturday 9th November –
    Roy Harris was to give a presentation on using an Arduino and explain is benefits in controlling various electrical gadgetry. Roy has been forced to postpone this presentation as he will be taking Rachel for a hospital visit, which we hope all goes well.

    We had also been hoping to undertake a Group discussion but at the same time also discuss and question individual members on what they have on their workbench, things they have completed in the past and how we can help these persons toward the Achievement Programme goals. It is not intended to be a clinic as such, nor a lecture, on how to do things but to talk and hopefully provide help so that people can gain certain AP certification. Take the Golden Spike Award, whilst not an AP element in its self it does allow someone to earn their first certificate. Jonathan Small and myself were going to head this session and understand Steve Park and Eric Belshaw MMR, wished to help too.
    Basically the Golden Spike (GS) is to show your familiarity with different areas of the hobby rather than expertise in a specific area. In most cases we suspect you have already qualified for this award.
    This GS entails constructing a layout or display/diorama of 8 sq. feet (4’ x 2’) which has either a double track or a main and passing loop. You would also be asked to show 6 items of rolling stock perhaps weathered or with added detail of decals and that the trains can be operated. Full details can be read on the NMRA website under the AP headings.
    It is too late to try and organise this session for November and whilst Christmas could be considered, the raffle and general chatting over mince pies may preclude that taking place at that meeting. So hopefully we can organise that early in the New Year when Jonathan and others are available.

    Christmas Raffle and prizes –
    Again, I am asking for your generous donation of prizes for our Christmas raffle. Hopefully we can again have a bumper event to raise funds for our Group. I know you all enjoy this event and that you will spend wisely buying heaps of tickets.

    Meet dates for 2020 –
    Mike Lenz is currently preparing these and we will advise the full year’s meeting dates in an email to each of you once that is complete.

    CALDER NORTHER FREIGHT CAR DECALS

    I was hoping to provide pictures of each of the items available from Alf Milliken but having problems with my scanner. So, I will bring samples of the sheets to Crewe on Saturday for you see the results of Alf’s successful production.

    As previously advised decal sheets are available in black or white printing plus there are some coloured logos showing the 4 Counties covered by the Calder Northern administrative area. Sorry Bill Hamilton-Turner the Isle of Man flag is not included on the decal but Alf can produce that if required!
    Decals are available in both N scale and HO scale and should anyone wish for larger sizes then that too can be arranged.

    Pricing is as follows: –
    • Normal black printed decals – HO or N scale – £3 per sheet (A4 size sheet with enough decals for both sides of 5 vehicles)
    • White printed decals or any special decals printed on white decal paper (double rose logo etc) – HO
    or N scale – £5 per A4 sheet as above.
    • 4 Counties Logo decals – price will be provided by Alf before November meet.

    Please note that if you request postage of your order, decals will not be sent folded and therefore a fixed price postal rate based on Royal Mail ‘Large letter rate’ of £2 first class or £1.80 second class will be charged for orders up to a dozen sheets.
    Decals delivered for collection at Crewe Heritage Centre will be delivered free of charge.

    Currently available are:
    • Data/Build Year data sheets (essentially blocks of numbers from 0-12 representing inches/months and 0-99 representing feet/years) in either Railroad Roman or Railroad Gothic, these being the two most common fonts for this.
    • Random car numbers in the 1000-100000 range.
    • Calder Northern wording and CNOR reporting number decals.
    • Locomotive warning marks such as “fire extinguisher”, “600 Volts” etc.
    • County flags of the 4 counties that make up the Calder Northern Group – Cheshire, Cumberland, Lancashire and Westmorland (no wording on these just the logo).

    If anyone wants a specific car number or simple text/logo Alf says he can do that FOC as he has a couple of part-used decal sheets that can be used. Anyone with specific artwork is welcome to supply him with a copy and he will try to replicate it, although there may be an additional cost involved.
    Details given above have been provided by Alf. He also says he can provide decals in ‘O’ scale if required but prices will be quoted separately for any requirements.

    If anyone has any questions or suggestions concerning the decals then please communicate directly with Alf Milliken but include c.c. to me so that your committee are also aware of your thoughts and suggestions.
    Thank you.

    Terry Wynne, Secretary.

  • TRAIN ORDERS – March 2019

     

     

                                                           CALDER NORTHERN GROUP

                                              TRAIN ORDERS March 2019

     

    Our next Group meeting is on Saturday 9th March when we will conduct our Annual General Meeting. The meeting will commence at 11.15 on that date and I include as part of this mailing a copy of the Agenda for our meeting. Please do come along and make your vote count.

    Copies of the minutes of the meeting held 18th April 2018 will be available on seats in the Middle Room at the Heritage Centre for your perusal prior to the meeting.

    You should have received from Paul Mitchell a copy of the 2019 weekend rota for the operation of North Western Mills layout when the Centre is open to the public. It is understood that the Centre is opening throughout October this year and this matter is something on which we have to reach a decision once we have elected our committee at the AGM.

    We are also holding a raffle on Saturday of all the additional prizes we received for the Christmas raffle in December but were too numerous to include on that day. So please do bring plenty of cash for your tickets as there are great prizes to be won. The raffle will follow once the AGM is completed and all ticket sales have been achieved. If you wish to bring further prizes then these will be much appreciated as the proceeds will help to offset the costs of our conversion to Digitrax control of North Western Mills layout.

    Unfortunately, we had to cancel the February Ladies Valentine event due to lack of attendees, hopefully we can sort out another time to say thank you to the ladies.

    Reports on each of the club layouts will be part of the AGM Agenda but we happy to say that the short circuit problem we had encountered has now been located and eliminated. The fitting of the Digitrax items can now proceed with good speed. Thank you to all those involved.

    I can advise that the NCE Command Module, Booster and 2 Throttles have been sold pending separation from the layout but there are still throttles and other items available for purchase. Prices are as advised previously. Five of the UTP’s are earmarked as sold for another purchaser.

    We have been advised by Dave Theobold that his email address is changing from 6th March to the following dandhtheo@gmail.com  Can you please update your records?

    Please note that some redecoration within North Junction Signal Box is taking place and the corridor may be blocked off so you may find it necessary to use the passageway through the relay room adjoining the gent’s toilet area.

    Mike Lenz also informs that the normal access to the clubroom on Wednesdays for a number of weeks will be closed off and he is arranging access via either of the fire door exits from the walking route alongside the Main Line fence. The reason for this is that the Middle Room has been hired by a company for staff training etc.

    See you on Saturday 9th.

    Terry Wynne

    Secretary

     

    Calder Northern Group

    Annual General Meeting Saturday 9th March 2019

    Commencing 11.15am at Crewe Heritage Centre

    1. Apologies
    2. Minutes of previous meeting
    3. Chairman’s report    (Tony Gath)
    4. Treasurer’s report    (Mike Lenz)
    5. Committee members due for re-election are Steve Scott, Alan Wyatt         Brian Burke (resigned)
    6. Election of Committee (Tony Gath)
    7. Heritage Centre rent agreement   (Terry Wynne)
    8. Review of member subs at monthly meetings
    9. Update on North Western Mills (HO); Devils Creek (HO) and Baltic Street Yard (N) layouts advice of upgrade of electrics etc (Steve Scott / Alan Wyatt)
    10. Budget for each of our 3 layouts   (Alan Wyatt)
    11. Cancellation of TAS Event at Manchester Airport in July 2019 (Terry Wynne)
    12. Future plans for Calder Northern Train Shows?
    13. Clinics/Presentations/Show & tell (Tony Gath/Len Ford)
    14. Any other business

     

  • TRAIN ORDERS – December 2018


    Friends,

    I can now inform you that the funeral of Andrew Wicks will be at 14.30hrs on 11 January. This will be at Vale Royal Crematorium, Shurlach Lane, Davenham, Northwich CW9 8RP

    For those using the M6, suggest you exit at Junction 19 and take the A556 west (signed Northwich and Chester). This busy road then becomes a dual carriageway and after passing the roundabout (A530) Shurlach Lane is then a short distance afterwards on your left hand side. Note there is no access to the A556 eastbound when exiting Shurlach Lane afterwards.

    Bob Bevan informs me that afterwards people will be gathering at the George & Dragon, Middlewich Road, Holmes Chapel, CW4 4EA.This is located on the North West corner of the crossroads of the A50 and B5308.

     

    Now to other news.-

    For those attending the Christmas Meet on 16th December will know, that as the number of members present at 11am was very low a decision was taken to hold the raffle but with a reduced number of prizes. However, a short time later we did find we had 17 members in attendance but as we had already started selling raffle tickets we would continue on that basis with the remaining prizes held over for another raffle at our March (AGM) Meeting. Everyone agreed this was the best option. Thanks to all who generously donated prizes – we had a bumper number on display and as said above half of these have been held back for the March Meet raffle. We are pleased to announce that sale of tickets for the raffle amounted to £171.

    Work on the issues on North Western Mills layout continue in an effort to eradicate the problems relating to the power breaker circuits and it may regretfully mean reduced running on the layout at our next meeting on January 12th.

    For those members who have in the past set up consists with their locos using the NCE system at the club please note that you will need to delete the consist set up, as when the new Digitrax wireless system is operational there will be no guarantee any pre-consisting will continue to work.

    Paul Mitchell has very kindly agreed to be the “Rota” organiser for the Group for 2019. Paul has requested that any member who already has booked dates in his calendar when they will not be available during the year to operate the layout at one of the weekend dates to please advise him before the meeting on 12th January. Paul’s phone number is 07880 501257 and email is paujosmit1@gmail.com

     

    >>>>>>>>>>>>>>>>>>>>>>>>>>

     

    Reminder – Selling of the NCE stuff – Once the layout goes live under Digitrax system control we will be offering for sale the NCE items currently in use.

    Please note we will only sell initially to Group members or members of their family first. Afterwards then we will consider how we deal with any unsold items, perhaps  considering advertising in Roundhouse or maybe placing items on eBay.

    We are looking for a sealed bid for the following combined lot containing –

    • NCE Power Pro Command module with 5amp (AC) power supply
    • NCE 5 amp Booster with 5 amp (DC) power supply
    • 1 NCE Pro-Cab throttle and cable

    Bids to be handed in a sealed envelope to Mike Lenz on or before our meeting on Saturday January 12th

    Plus other accessories will be sold as follows –

     

    NCE Pro Cab Throttles – £60 each (4 available for sale)

    NCE Small Cab Throttles – £15 each (3 available for sale)

    NCE UTP’s – £10 each (10 available for sale)

     

    Please take into account some of the above equipment for sale has been in use for the past 10 years and may have been superseded by newer versions of the same item.

    All equipment for sale is currently in use but you will realise all items for sale must be “sold as seen”.

     

    Circuit breakers and frog juicers in use under the layout will be retained for use with the new system.

    >>>>>>>>>>>>>>>>>>>>>

    Finally for this newsletter, will anyone wishing to put themselves forward or nominate someone else (with their permission of course) as committee members please advise Terry Wynne as soon as possible. As you know Brian Burke has decided he does not wish to stand for a further term thus creating a vacancy.

    We are also asking if anyone has a question or topic they wish to put forward for discussion at our AGM on Saturday 9th March will they please let Terry Wynne have the details by 17th February at our February Meet, thank you.

     

    Terry Wynne

    Secretary

     

  • TRAIN ORDERS – November 2018 – EXTRA

    EXTRA notes

     A quick reminder – our next meeting is this coming Saturday 10th November.

    Please arrive as early as you can so you can park on site. A large number of people could turn up for the “Patriot” loco event.

    Don’t forget the latest new build steam locomotive; a “Patriot” Class loco – to be named “The Unknown Warrior” is on display in the Exhibition Hall this coming weekend. There will be unveiling at 3pm of the new crest for the loco by Simon Weston CBE.

    Andy Wicks and Bob Bevan have kindly agreed to cover Sunday 11th November and we appreciate them stepping in to help to operate the layout. Thanks guys!

    We understand there may be a short prayer service on Sunday, sorry no more details are known at the moment.

    It is understood that the December weekend opening at the Heritage Centre is to be just confined to the 8th and 9th of December, the week before our Christmas meeting. Volunteers to cover operating that weekend will be much appreciated. Please don’t forget raffle prizes for Sunday 16th December.

    I list below our meeting dates for 2019

     

    Saturday January 12

     Sunday February 17 (Valentine’s meet!!)

     Saturday March 09 (AGM)

     Sunday April 14

     Saturday May 11

     Sunday June 09

     Saturday July 13

    Sunday August 11

     Saturday September 14

    Sunday October 06

     Saturday November 09

    Sunday December 15 (Xmas Meet)

     

    Terry Wynne

    Secretary

     

  • TRAIN ORDERS – November 2018

    Hello,

    Important News – Change of Meeting date

    Will you please note that our next meeting planned for 17th November has been changed to that of Saturday 10th November. The reason for this change is that the Signal Display Room in North Junction Signal Box has had a long term booking and will mean that members will not be able to access our clubroom without using the outside path and enter the clubroom via the fire door near the large picture window, With the weather going much colder this would impact on the room retaining any heat and it has therefore, been decided to move the date forward one week to avoid this other booking. Sorry for any inconvenience this may cause you.

    Further to the message above, on the 10th and 11th November the Heritage Centre is open to the public for the visit of the latest steam locomotive being built. This loco a LMS “Patriot class” which is going on display in the exhibition hall; the frames along with the boiler and cab are being put together to show what the loco will look like once final construction is complete. A tender will also be in arriving before that weekend. The loco will eventually be named “The Unknown Warrior” I understand a service could be held on the Sunday at 11am to observe the usual silence and prayers commemorating the end of the First World War 100 years ago although there will certainly be a service in the town square just beyond the New Life Centre.

    It would be much appreciated if a couple of members would come along to operate on the Sunday the 11th so those members of public who are attending the site can visit all the Centre’s attractions.

    The Heritage Centre is also going to open its doors for a few hours on the three weekends leading up to Christmas and we have been asked if we could supply some cover for our layout during those weekends. Sunday the 16th December is of course our Christmas meeting with the usual raffle and mince pies etc. I have said that we require the corridor to be unavailable to the public on that date due to reasons of our raffle prizes being on display in the Signal Display Room along with our festivities in the clubroom.

    It is understood the weekend opening hours are likely to be 10am to 2.30 or 3pm. Volunteers to operate at these Christmas weekends would gain ‘ Brownie points’ and their offer would be much appreciated. This is also a good time to remind and request members to consider donating raffle prizes, hopefully with the same generosity you have shown in previous years. Thank you very much.

    Your committee has recently been debating what changes could be made to our train control system following some suggestions from members who are finding difficulty in ‘ducking under’ the layout and also having to walk from one end to the other of the layout to throw switches. Alan Wyatt has kindly been searching options and it looks like the best option is to change to a wireless control system. We would of course dispose of the NCE system to help offset the cost of the new system but current funds will allow us to proceed once a tender exercise has been completed. The benefits of the change can mean that members controlling a train can walk around the layout with their train without having to unplug the throttle which is a source of continual breaking of connections. All other options such as consisting, will be available from a new system similar to the current NCE equipment. Other options being looked at include merging the track switch panels together on each side to reduce the amount of walking from end to end.

    Following our last meeting when Mick Moignard gave us an excellent presentation Tony Gath has received some additional information from Mick regarding speakers and micro connectors and so on. – I will send this information to Len Ford and ask him to load this to our website so it is available for all to read.

    There are still some items left of the Stuart Wood collection such as foam underlay, plus some Preiser figures and other small items. Do have a look at the next meeting and make an offer for items you wish to purchase.

    Paul Mitchell has kindly offered to take up the role of Rota organiser. We will hand him details at the next meeting and if members can advise Paul of any dates next year that they will be unavailable then please do so as soon as you are able and ideally before he draws up the rota.

    Thank you Paul, your offer is much appreciated.

    Terry Wynne,

    Secretary